| Material | Stainless Steel | SUS201,SUS303,SUS304,SUS316,SUS416,SUS420,17-4PH,SUS440C |
|---|
| Steel | Q235,C20,C45(K1045),1214,1215 | |
|---|
| Copper | C36000(C26800),C37700(HPb59),C38500(HPb58),C27200(CuZn37),C28000(CuZn40/H62),C3604, C51000, C52100, C54400,CuSn8 | |
|---|
| Alumina | AL2024,AL5754(Almg3),AL5083,AL6061,AL6063,AL5052,AL7075 | |
|---|
| Alloy Steel | SCM435,10B21 | |
|---|
| Plastic | PA6,PA66,PP,PC,POM,FR4,ABS,Acrylic | |
|---|
| Machining Processes | CNC 3-axis, 4-axis machining, CNC milling, CNC turning, CNC Lathe High precision 5-Axis turning-milling combined machining, CNC milling and turning, drilling, grinding, stamping, tapping, bending, laser cutting, welding etc | |
|---|
| Finish | Heat treatment, powder coating, electroplating, spraying, painting, polishing, deburring, wire drawing/brushed, anodizing, chrome plating, nickel plating, tin plating, silver plating, gold plating, galvanizing, blackening etc. | |
|---|
| Dimensions | Customized | |
|---|
| Tolerance | ±0.005mm | |
|---|
| Drawing Format | PDF/JPEG/AI/PSD/CAD/Dwg/Step/LGS | |
|---|
| MOQ | Negotiable | |
|---|
| QC Policy | 100% inspection and random inspection before shipment, with QC passed label | |
|---|
| Stardard | Materials and surface treatment comply with RoHS/Reach Directives | |
|---|
| Testing Equipments | CMM, Projector, Pull Tester, Automatic Optical Inspector, Salt Spray Tester, Durometer, Tensile Machine, height gauge, micrometer, plug gauge, thread Gauges, digital caliper and etc. | |
|---|
| Application | Automotives, Optical instrument, medical device, industrial machine, automobile, electric appliance, robot, computers, tele-communication, electronic device, digital communication, UAV, aerospace, bicycle, pneumatic tools, hydraulic and other industries, | |
|---|
| Packaging | PE bags or bubble bags, boxes, cartons, pallet, standard carton or plastic tray, sponge tray, cardboard tray or as per customers' requirements | |
|---|
| Trade Terms | EXW, FOB, CIF, As per customers' request | |
|---|
| Payment Terms | Paypal or Western Union for sample orders; Larger amount by T/T with 30% as deposit,70% before shipment | |
|---|
| Delivery Time | Within 15-20 working days after deposit or payment received | |
|---|
| Shipping Ports | FOB Dongguan, FOB Shenzhen, FOB Hongkong | |